Join our community
Receive expert tips and updates on electrical safety.
Deliverables: PDF report with NEC Article 220 load calculation, panel sizing check, and up to 30 minutes of revision notes.
Turnaround: 2-3 business days.
What we need: Address, square footage, major appliances list, panel photos, and any existing plans.
Notes: Non-stamped contractor review. PE stamp can be coordinated for an additional fee.